NIZNIY NOVGOROD STADIUM
Completed work:
-
suppling of electrotechnical equipment
-
development of engineering solutions for outdoor lighting
-
lighting calculations
The object is located on a problematic soil. The implementation of the stadium’s outdoor lighting system required the development of a specific concrete insert for the foundation of footing. In addition, the task of combining outdoor and architectural lighting systems was solved.
The solution is implemented on the equipment of GALAD TM, Opora Inzhiniring TM, OSRAM TM
The work was managed in constant cooperation with the Design Institute PI «ARENA» and the Ministry of Sport
Customer:
FGUP Sport-Inzhiniring, the Ministry of Sports of Russia
Description of the object:
World class stadium built for the 2018 FIFA World Cup. The capacity is over 45,000 people. Built on the Strelka, at the influx of the Oka River into the Volga
Address:
Russia, Nizhny Novgorod, Betankura Street, 1A
Link to wikipedia